20141127_104812
Installed the speakers for R2.
Date: 11/27/2014
Views: 671
|
20141127_104804
Speakers are 2 JBL surround speakers I disassembled.
Date: 11/27/2014
Views: 889
|
20141128_171222
I stalled the amp I had laying around.
Date: 11/28/2014
Views: 601
|
20141128_171230
With 80w R2 can hurt your ears it's so loud.
Date: 11/28/2014
Views: 1376
|
20141129_003107
Installed slip ring and finished the connectors.
Date: 11/29/2014
Views: 632
|
10625024_10205084334086251_7176003217923197967_n
testing the R series logics
Date: 12/09/2014
Views: 426
|
10805641_10205087630408657_6281525110521345902_n
Drilled and tapped the resin rear logic bezel
Date: 12/09/2014
Views: 418
|
10675610_10205087630688664_2890145605675449052_n
checking the clearances
Date: 12/09/2014
Views: 405
|
10396277_10205087630808667_6353892627030505419_n
beginning to assemble/add the fiber optics
Date: 12/09/2014
Views: 399
|
1509980_10205123751951673_4935756848515791354_n
Completed rear R Series logic assembly
Date: 12/09/2014
Views: 375
|
10376829_10205123753111702_7192832302954626435_n
Testing the R Series logic before attaching to the bezel
Date: 12/09/2014
Views: 401
|
1898084_10205123753791719_6585641494077929345_n
Attached to the bezel pre adding the nuts. Had to counter sink the nuts on the back of the bezel to clear the R Sreies logic posts. Electrical tape is there to capture the nuts for the bezel
Date: 12/09/2014
Views: 420
|