CW R2 Center foot side panel
Center foot shell Panel layout. Dimensions are outside measurements. Adjust for material thickness.
Date: 11/05/2010
Views: 318
|
CW center foot shell 1
The center foot shell cut out of sheet alu and ready to bend.
Date: 11/05/2010
Views: 418
|
CW center foot shell 2
Center foot shell after bending.
Date: 11/05/2010
Views: 382
|
CW center foot shell 3
Center foot shell after bending.
Date: 11/05/2010
Views: 459
|
CW center foot shell 4
CW center foot shell compared to Krider center foot shell
Date: 11/05/2010
Views: 426
|
CW center foot shell welded
The foot shell is all welded up and ground/sanded smooth.
I just have to cut the slot for the foot channel.
Date: 11/06/2010
Views: 472
|
CW center foot shell mounted
The foot shell painted and mounted on the droid.
Now to work on the detail pieces.
Date: 11/06/2010
Views: 429
|
CW Center foot details 1
Half moons for the center foot finished. The green part is a chunk of thick wall PVC pipe glued in for a solid base to run screws into.
Date: 11/26/2010
Views: 452
|
CW Center foot details 2
Made from 6" PVC sewer pipe. The moon shaped bump is a piece of 1/8" square styrene that was heated and bent to match the curve.
Date: 11/26/2010
Views: 467
|
CW Center foot details 3
The Half moons installed
Date: 11/26/2010
Views: 428
|
CW Center foot details 4
The Half moons installed
Date: 11/26/2010
Views: 439
|
CW Center foot details 5
Making the ankle cylinders out of 3/4 PVC pipe and some glue on caps.
Date: 11/26/2010
Views: 426
|