The angled table allows the top ring to be sanded down to the pencil line with almost no material removed from the bottom.
Date: 07/21/2018
Views: 233
|
Sanding completed. The slight bevel allows the ring to sit properly inside the bottom of the inner dome.
Date: 07/21/2018
Views: 222
|
.040 x .080 Evergreen styrene strip ( part #144 ) is used to correctly space the outer ring below the panels for gluing.
Date: 07/21/2018
Views: 239
|
The styrene strip is placed between the ring and the bottom edge of the outer dome, snugged up and then taped in place.
Date: 07/21/2018
Views: 249
|
Turn the dome upside down and glue the bottom edge first between the tape. After the glue sets, remove tape and finish gluing.
Date: 07/21/2018
Views: 277
|
2865_R2_Master_Build_009923
Date: 07/21/2018
Views: 235
|
2865_R2_Master_Build_010065
Date: 07/21/2018
Views: 240
|
2865_R2_Master_Build_010162
Date: 07/21/2018
Views: 254
|
2865_R2_Master_Build_010483
Date: 07/21/2018
Views: 209
|
2865_R2_Master_Build_010535
Date: 07/21/2018
Views: 199
|
2865_R2_Master_Build_010695
Date: 07/21/2018
Views: 228
|
2865_R2_Master_Build_010794
Date: 07/21/2018
Views: 210
|