Glue the inside edge of the top ring first.
Date: 07/21/2018
Views: 232
|
The outer edges of the top ring are glued next, followed by the spokes and lastly the lower panel curves.
Date: 07/21/2018
Views: 192
|
After gluing, the inner dome is marked for cutting where opening panels will be.
Date: 07/21/2018
Views: 211
|
The inner dome is also marked for opening pie panels on top.
Date: 07/21/2018
Views: 182
|
The curved lip of excess styrene is trimmed away from the bottom of the dome ( final trimming still to come ).
Date: 07/21/2018
Views: 195
|
Being visible when the lower dome panels are opened, A section of the topmost ring is carefully sawed through and removed.
Date: 07/21/2018
Views: 220
|
The section removed.
Date: 07/21/2018
Views: 210
|
When installed, the modified ring will sit just below the panel openings.
Date: 07/21/2018
Views: 225
|
A drum sanding bit installed in the drill press is used to smooth the inside of the rings.
Date: 07/21/2018
Views: 227
|
Inner sanding completed.
Date: 07/21/2018
Views: 194
|
Marking the outside of the top ring in preparation for sanding a bevel on the outside.
Date: 07/21/2018
Views: 240
|
The bevel is made using a vertical sander. The support table is angled slightly so material is removed from the top edge.
Date: 07/21/2018
Views: 408
|