Glue the inside edge of the top ring first.
Date: 07/21/2018
Views: 242
|
The outer edges of the top ring are glued next, followed by the spokes and lastly the lower panel curves.
Date: 07/21/2018
Views: 199
|
After gluing, the inner dome is marked for cutting where opening panels will be.
Date: 07/21/2018
Views: 222
|
The inner dome is also marked for opening pie panels on top.
Date: 07/21/2018
Views: 188
|
The curved lip of excess styrene is trimmed away from the bottom of the dome ( final trimming still to come ).
Date: 07/21/2018
Views: 203
|
Being visible when the lower dome panels are opened, A section of the topmost ring is carefully sawed through and removed.
Date: 07/21/2018
Views: 231
|
The section removed.
Date: 07/21/2018
Views: 219
|
When installed, the modified ring will sit just below the panel openings.
Date: 07/21/2018
Views: 230
|
A drum sanding bit installed in the drill press is used to smooth the inside of the rings.
Date: 07/21/2018
Views: 235
|
Inner sanding completed.
Date: 07/21/2018
Views: 201
|
Marking the outside of the top ring in preparation for sanding a bevel on the outside.
Date: 07/21/2018
Views: 245
|
The bevel is made using a vertical sander. The support table is angled slightly so material is removed from the top edge.
Date: 07/21/2018
Views: 411
|