Login
Gallery Members Albums Chewbakken Brian Munger Styrene Dome Assembly Pics
Advanced Search
View Slideshow

Chewbakken

1. Vex... ... 4. Series R2... 5. Various Pics 6. Styrene... 7. Brian... 8. Transport... 9. Budget... 10. The goal ... 176. trunk_or_tr...

Random Image

1.Overall_test_fit_shoulder_hubs

1.Overall_test_fit_shoulder_hubs

Date: 06/03/2012 Views: 511

Brian Munger Styrene Dome Assembly Pics

Date: 07/09/2018
Owner: Chewbakken
Size: 75 items
nextlast
first previous
Glue the inside edge of the top ring first.

Glue the inside edge of the top ring first.

Date: 07/21/2018
Views: 263
The outer edges of the top ring are glued next, followed by the spokes and lastly the lower panel curves.

The outer edges of the top ring are glued next, followed by the spokes and lastly the lower panel curves.

Date: 07/21/2018
Views: 219
After gluing, the inner dome is marked for cutting where opening panels will be.

After gluing, the inner dome is marked for cutting where opening panels will be.

Date: 07/21/2018
Views: 243
The inner dome is also marked for opening pie panels on top.

The inner dome is also marked for opening pie panels on top.

Date: 07/21/2018
Views: 204
The curved lip of excess styrene is trimmed away from the bottom of the dome ( final trimming still to come ).

The curved lip of excess styrene is trimmed away from the bottom of the dome ( final trimming still to come ).

Date: 07/21/2018
Views: 219
Being visible when the lower dome panels are opened, A section of the topmost ring is carefully sawed through and removed.

Being visible when the lower dome panels are opened, A section of the topmost ring is carefully sawed through and removed.

Date: 07/21/2018
Views: 249
The section removed.

The section removed.

Date: 07/21/2018
Views: 237
When installed, the modified ring will sit just below the panel openings.

When installed, the modified ring will sit just below the panel openings.

Date: 07/21/2018
Views: 251
A drum sanding bit installed in the drill press is used to smooth the inside of the rings.

A drum sanding bit installed in the drill press is used to smooth the inside of the rings.

Date: 07/21/2018
Views: 254
Inner sanding completed.

Inner sanding completed.

Date: 07/21/2018
Views: 214
Marking the outside of the top ring in preparation for sanding a bevel on the outside.

Marking the outside of the top ring in preparation for sanding a bevel on the outside.

Date: 07/21/2018
Views: 255
The bevel is made using a vertical sander. The support table is angled slightly so material is removed from the top edge.

The bevel is made using a vertical sander. The support table is angled slightly so material is removed from the top edge.

Date: 07/21/2018
Views: 424
nextlast
first previous
Page: 1 2 3 4 5 6 7
Powered by Gallery v2.3