Login
Gallery Members Albums Chewbakken Brian Munger Styrene Dome Assembly Pics
Advanced Search
View Slideshow

Chewbakken

1. Vex... ... 4. Series R2... 5. Various Pics 6. Styrene... 7. Brian... 8. Transport... 9. Budget... 10. The goal ... 176. trunk_or_tr...

Random Image

RearDoorPanels.Jpg

RearDoorPanels.Jpg

Date: 01/01/1980 Views: 1191

Brian Munger Styrene Dome Assembly Pics

Date: 07/09/2018
Owner: Chewbakken
Size: 75 items
nextlast
first previous
Disc removed.

Disc removed.

Date: 07/21/2018
Views: 267
A relief section is marked for cutting on the inner dome for the dome bump castings.

A relief section is marked for cutting on the inner dome for the dome bump castings.

Date: 07/21/2018
Views: 263
A Dremel with a cutting disc is used for removing the section.

A Dremel with a cutting disc is used for removing the section.

Date: 07/21/2018
Views: 254
Cleaning the inside of the laser-cut edges with a file and sanding sticks.

Cleaning the inside of the laser-cut edges with a file and sanding sticks.

Date: 07/21/2018
Views: 282
The top edges are smoothed down with 320 grit sandpaper.

The top edges are smoothed down with 320 grit sandpaper.

Date: 07/21/2018
Views: 254
All lower openings on the outer dome are then sanded and cleaned up.

All lower openings on the outer dome are then sanded and cleaned up.

Date: 07/21/2018
Views: 290
Panel locations are transferred to the outside as the inside markings will be covered once the inner dome is glued into place.

Panel locations are transferred to the outside as the inside markings will be covered once the inner dome is glued into place.

Date: 07/21/2018
Views: 251
To clean the surfaces before gluing, the inner dome and the inside of the outer dome are sprayed with alcohol and wiped down.

To clean the surfaces before gluing, the inner dome and the inside of the outer dome are sprayed with alcohol and wiped down.

Date: 07/21/2018
Views: 289
Glue holes are marked and drilled on the inner dome between the upper and lower panel openings.

Glue holes are marked and drilled on the inner dome between the upper and lower panel openings.

Date: 07/21/2018
Views: 292
Cleaning the inside of the outer dome.

Cleaning the inside of the outer dome.

Date: 07/21/2018
Views: 244
Needle-point applicators for applying the weld-on 3.

Needle-point applicators for applying the weld-on 3.

Date: 07/21/2018
Views: 285
Respirator, gloves and protective eyewear are used when gluing.

Respirator, gloves and protective eyewear are used when gluing.

Date: 07/21/2018
Views: 237
nextlast
first previous
Page: 1 2 3 4 5 6 7
Powered by Gallery v2.3